Generation Energy, Inc. Receives Federal Aviation Administration Approval For Its Keyes Wind Farm Project

Sterling,VA- Generation Energy, Inc. is pleased to announce that the Federal Aviation Administration (FAA) issued a formal approval on February 20, 2009 for the siting of wind turbines within Generation Energy’s Keyes Wind Farm.

  1. The 42 MW Keyes Wind Farm will be directly north of Keyes, Oklahoma, and is being planned for the commencement of construction to begin in late summer 2009.

The Federal Aviation Administration’s approval has determined that none of the 28 proposed turbine locations will present a hazard to air navigation.  In addition, a turbine lighting scheme acceptable to the FAA was provided, which will be used by Generation Energy.  The project will still require acceptable arrangements for the sale of the energy in order to be built.

top

Published in:  on May 4, 2009 at 3:53 pm Leave a Comment

The URI to TrackBack this entry is: http://boisecitynews2.wordpress.com/2009/05/04/generation-energy-inc-receives-federal-aviation-administration-approval-for-its-keyes-wind-farm-project/trackback/

RSS feed for comments on this post.

Leave a Comment